From Boeing 737NG - New Generation
To
Boeing 737NGE - New Generation Engine/Enhanced, or
Boeing 737NEW - New Engine, Wider, or
Boeing 737NEX - New Engine eXtra
The Boeing 737NG re-engining should be simple and budgeted at $1 billion maximum to fund for the Boeing 797 introduction in 2020.
Other design criteria
- Minimal Boeing 737NG production line disturbances
- Maximum Boeing 737NG commonality
- 15% operating cost advantage over Boeing 737NG
- Wider cabin with better wall interior fittings
- Better more spacious seats and seating configuration, similar to Air New Zealand concept
It should come out before the A320NEO at the -800 version size in 2014, then the -900 version in 2015. If the costs are right, these can be assembled in the Long Beach C-17 plant that is winding down production. And/Or in the area of the new 787 plant in South Carolina.
The -700 and -600 versions should transition directly to the new Boeing 797 to cover the CSeries and new Embraer competitors.
No comments:
Post a Comment